Loading...

Empowering Western NC and Upstate SC with Solar Since 1995

PROJECT PROFILE

Two Fire Stations have each been fitted with a 2 collector solar hot water system as part of the City of Asheville’s sustainability initiatives.

  • Commercial

    Category

    Commercial

  • Location

    North Carolina

Why Partner with Sundance Power Systems?

Our 5 step design process sets the standard

Our Renewable Energy Consultants are not high-pressure sales people offering poorly constructed solutions and pipe-dream financing options. Our 5 Step Process is based upon listening to our customers and designing systems that empower a clean energy lifestyle.

Contact Sundance today
for a free evaluation

    Work Type

    Testimonial